As the name suggests this project was built on a 5 way intersection in the busy South Terrace precinct. The building envelope consumed the entire site which meant a lot of planning and site management went in to keep the local community not only happy but also with their businesses functioning without interruption.

Project Detail
  • Location: Fremantle
  • Brief: Build 7 luxury penthouse apartments, 13 commercial office suites and 5 retail outlets
  • Budget: $5,300,000
  • Timeframe: 15 Months

A local success

We chose to use some cutting edge pre-fabricated wall framing systems to speed up the process and limit the wet trades at the end of the project. The intricate design makes the most of the street scape by incorporating a nautical bridge feel with its crisp contemporary lines. The building has been well received by both developer and Freo locals alike.

The project has been a resounding success with businesses and tenants as they enjoy its close proximity to the Freo hub and all the 5 star comforts of a luxury resort at their finger tips whilst being only a stone's throw away from the ocean's edge.

COMMENT / Testimonial

"Projects have run to schedule and budget and the quality of finish must be second to none..."